
Cable Oilers – Extend Cable and Sheave Life
Cable oilers are designed to keep elevator cables properly lubricated, improving performance and significantly extending the service life of both cables and sheaves. Installed directly onto hoist cables, these oilers reduce friction and wear while promoting smoother operation. To determine the correct oiler size, measure the total width of the cable group and add 1" to each side.
- Maintains proper cable lubrication
- Reduces friction and prolongs cable and sheave life
- Easy installation directly onto cable bundle
- Available in multiple sizes for different cable arrangements
Model Table
Model | Size | Description |
---|---|---|
CO4 | 4" | For narrow cable groups; compact elevators |
CO7 | 7" | Standard mid-sized cable sets |
CO9 | 9" | For wider elevator hoist cables |
CO12 | 12" | Heavy-duty and large cable bundles |
CO16 | 16" | For maximum cable span or multiple bundles |